How It Works

Our Process

A clear process from the first visit to final cleanup. The written proposal spells out the scope, the cost and the finish condition.

Your written proposal outlines the project scope, costs, and final site condition.

01. Initial Phone Consultation

We discuss your project goals, location, and timeline to determine if we are the right fit for your demolition work.

02. Site Walk & Scope Review

We visit the property to assess access, safety requirements, and precise scope of work to ensure accurate pricing.

03. Testing, Permits & Utilities

We handle required demolition permits and necessary utility disconnections, coordinating with agencies, utility providers, and qualified trades. Testing may be required; if abatement is necessary, we can coordinate an appropriately licensed third-party contractor. Planet Demolition does not perform hazardous-material abatement.

04. Written Itemized Proposal

You receive a clear, written estimate detailing the exact scope of work, inclusions, exclusions, and cost.

05. Scheduling & Site Protection

Once approved, we schedule your project and set up necessary site protection, fencing, and safety measures.

06. Demolition & Material Removal

Controlled teardown and systematic removal of all structural debris, concrete, and materials using professional equipment.

07. Cleanup & Turnover

We haul away demolition debris for legal disposal and perform final cleanup. The written proposal describes the agreed final site condition.

Frequently Asked Questions

What are the steps of a house demolition?

The usual steps are: estimate and contract, asbestos survey if required, demolition permit, utility disconnects, salvage or soft strip, structural teardown, loading and hauling debris, foundation or slab work if included, and final cleanup and inspection. Planet Demolition handles the permit and coordinates the disconnects with PG&E, SMUD or your local utility.

What needs to happen before demolition can start?

Before demolition, the permit must be issued, utilities disconnected, and any required asbestos survey or air district notice completed. Personal items should be removed, and anything to save should be marked. The start date depends on when those steps are done, which is why we start paperwork as soon as the contract is signed.

How will my property be left after demolition?

We leave the site as written in the proposal: structures and listed slabs removed, debris hauled, and the area cleaned up. Backfill and compaction are included only when listed. Your builder or landscaper can take over from there, and we confirm the handoff condition with them before we bid.