House demolition in Chico, Roseville, Sacramento, Yuba City, or Auburn does not start the morning you call. It starts when the parcel jurisdiction, surveys, utilities, and written scope are ready. Field demolition for a typical house is often measured in working days, not months, once those items are done. We still will not print a fake average.
What happens before the first machine day
Preparation starts with a walk-through, a written estimate, and decisions on foundations and salvage. Planet Demolition handles required demolition permits and necessary utility disconnections, coordinating with providers and qualified trades. Testing or air-district notifications may be required. We do not perform hazardous-material abatement, but can coordinate an appropriately licensed contractor if needed. Any of these steps can affect the schedule; your proposal outlines the scope and costs.
What happens on site
Soft strip if contracted, structure take-down, loading, legal disposal, then slab or footing work only if written. Cleanup matches the proposal. Import fill and compaction are not automatic.
What stretches the calendar
Narrow infill lots, Auburn grade, shared driveways, incomplete disconnects, and late surveys. Interior-only jobs and full house jobs are different calendars. See house demolition, city house pages, and the preparation checklist.